Touchstone brings Carapal Ridge 3 onstream in Trinidad

Touchstone Exploration brought the Carapal Ridge 3 well onstream 28 March 2026, tied into the Central block natural gas facility in Trinidad and Tobago, where it is currently flowing natural gas and condensate during the cleanup phase with intermittent peak rates of up to 5.7 MMcf/d. Gross natural gas throughput on the Central block has …

The post Touchstone brings Carapal Ridge 3 onstream in Trinidad appeared first on Drilling Contractor.

 News, Onshore Advances  

Scroll to Top