Drilling begins at Monument Wilcox development in US Gulf

Beacon Offshore commenced drilling operations at the Monument Wilcox oil discovery in the US Gulf of Mexico, with continuous drilling and completion activities planned throughout 2026 and first production on track by late 2026, according to Talos Energy’s Q1 2026 operational update. Monument is located in Walker Ridge blocks 271, 272, 315 and 316 and …

The post Drilling begins at Monument Wilcox development in US Gulf appeared first on Drilling Contractor.

 Global and Regional Markets, News  

Scroll to Top