Beach Energy reported progress on its Equinox rig campaign and Cooper Basin drilling program during Q1 2026, though severe weather disrupted operations across both programs. In the offshore Otway Basin, Beach received the Transocean Equinox rig from a consortium member after quarter-end and commenced Phase two of the campaign shortly thereafter. A well intervention at …
The post Beach Energy kicks off Equinox Phase 2, drills 13 wells in Cooper Basin appeared first on Drilling Contractor.
News, The Offshore Frontier
